200,000 sf, 8-story, 450 space post-tensioned concrete parking garage with metal façade and art installations.
Role in Project: Preconstruction lead as well as Project Manager (with CM/GC) from early design through closeout.
Certified Professional Estimator (CPE) Certified Professional Constructor (CPC)